Project Summary This was a 70,000 square foot plastic pipe manufacturing facility. One unique feature was a 60 foot high attached tower with 2 floors with a 5 ton crane at the roofline.
|
|---|
|
Project Summary This project was a 45,000 square foot steel fabrication facility. The double crane-way systems supports 4, 10 ton cranes.
|
|---|
|
Project Summary Construction of a 75,000 square foot industrial building that supports 2, 10 ton and 2, 30 ton cranes with a centerline of crane rail with a dimension of 100 feet.
|
|---|
|
Project Summary This was a 25,000 square foot industrial equipment manufacturing facility. This structure supports 3, 7.5 ton cranes and several jib cranes.
|
|---|
|
Project Summary This is a 40’x85’x33’building has a 35 ton bridge crane and is used for receiving and shipping for a major heavy equipment repair facility
|
|---|
|
Project Summary 9,000 sqft manufacturing facility expansion utilizing an R-30 roof insulation system
|
|---|